Cingleot Premium Logistics Centre, Kwo Lo Wan of HKIA, Hong Kong

SCBS
.
Project
Cingleot Premium Logistics Centre, Kwo Lo Wan of HKIA, Hong Kong
.
Developer
Alibaba Group
.
Scope of Works
Air Duct
.
Anticipated Completion Date
2022
.
.
PROPOSED INDIVIDUAL DEVELOPMENT AT LOT 313 AND TWIL 49 TSUEN WAN NT

SCTD
.
Project
PROPOSED INDIVIDUAL DEVELOPMENT AT LOT 313 AND TWIL 49 TSUEN WAN NT
.
Developer
Goodman
.
Scope of Works
Genset Installation
.
Anticipated Completion Date
2022
.
.
Chongqing Hon Kwok Centre - MVAC Replacement Works

CSCE&M Tech (SZ)
.
Project
Chongqing Hon Kwok Centre - MVAC Replacement Works
.
Developer
Haorong Industry (Chongqing) Co., Ltd
.
Scope of Works
Design & Build of 12 sets air cooled chiller (Total cooling capacity 10000 Kw)
.
Anticipated Completion Date
2022
.
.
MACAU COTAI HEALTHCARE COMPLEX (Administration Building, Auxiliary Building)

SCTD
.
Project
MACAU COTAI HEALTHCARE COMPLEX (Administration Building, Auxiliary Building)
.
Developer
Health Bureau of Macao Special Administrative Region
.
Scope of Works
Supply of Busduct
.
Anticipated Completion Date
2022
.
.
MACAU Empreitada de Alargamento da Fase 1 do Centro Hospitalar Conde São Januário – Edifício de Especialidade de Saúde Pública

SCTD
.
Project
MACAU Empreitada de Alargamento da Fase 1 do Centro Hospitalar Conde São Januário – Edifício de Especialidade de Saúde Pública
.
Developer
Health Bureau of Macao Special Administrative Region
.
Scope of Works
Supply of Busduct & Genset Installation
.
Anticipated Completion Date
2022
.
.
澳門 離島醫療綜合體 - 主體建造工程

SCBSM / SCTD / CSCI
.
Project
澳門 離島醫療綜合體 - 主體建造工程
.
Developer
Health Bureau of Macao Special Administrative Region
.
Scope of Works
MVAC & Ventilation System Installation (complex hospital building)
.
Anticipated Completion Date
2022
.
.
NKIL 6565 & 6562, Kai Tak (The Henley)

SCTD
.
Project
NKIL 6565 & 6562, Kai Tak (The Henley)
.
Developer
Henderson Land Development Co. Ltd
.
Scope of Works
Supply 1,915 Nos. (3Hp – 10Hp) Daikin Water Cooled VRV
.
Anticipated Completion Date
2022
.
FO TAN SLC DATA CENTER PHASE 2

SCTD
.
Project
FO TAN SLC DATA CENTER PHASE 2
.
Developer
Hong Kong Telecommunications (HKT) Ltd.
.
Scope of Works
Genset Installation
.
Anticipated Completion Date
2022
.
.
Kwong Wah Hospital

SCTD / SCEE
.
Project
Kwong Wah Hospital
.
Developer
Hospital Authority
.
Scope of Works
Cable Containment
.
Anticipated Completion Date
2022
.
.
Tuen Mun Hospital, Tuen Mun, Hong Kong